Buyers and lenders in Northern Virginia often assume the title policy will protect them if a zoning problem turns up after closing. Usually it won’t. A standard title policy is built to insure ownership of the land, not compliance with the zoning code, and the gaps matter most in Fairfax, Arlington and Alexandria, where older buildings, proffered conditions and decades of rezonings are common.
What a standard title policy leaves out
The standard ALTA owner’s policy has an exclusion, Exclusion 1(a), for any law, ordinance, permit or governmental regulation, “including those related to buildings and zoning.” There is one narrow way back in: Covered Risk 5 covers a zoning violation only if a notice of the violation or of an intent to enforce has been recorded in the public land records.
In 2024 the Supreme Court of Missouri applied that language in Sachtleben v. Alliant National Title Insurance Co. The buyers faced a city zoning lawsuit, and the insurer even knew about it from the title commitment. Because no notice had been recorded in the county land records, the court held the insurer had no duty to defend. A pending court case was not enough.
What a zoning endorsement adds, and what it doesn’t
Lenders on commercial loans usually ask for an ALTA 3-series zoning endorsement. The ALTA 3.1 endorsement, for a completed structure, insures against loss from a final court decree that prohibits the use or requires the structure to be removed or altered because of a zoning violation that existed on the policy date. It covers five items: the area, width or depth of the lot; floor area; setbacks from the property lines; building height; and the number of parking spaces.
That is valuable, but it is narrow. It pays only after a final court decree, it does not insure against fines or a city’s notice of violation, and it says nothing about building or fire code violations, open permits or a missing certificate of occupancy. Title underwriters generally want zoning evidence before they will issue the endorsement, which is one reason lenders order a zoning report.
Virginia’s protection for older buildings
Virginia law gives older buildings some protection. Under Virginia Code § 15.2-2307(E), a locality cannot declare a building illegal and subject to removal for not meeting the zoning ordinance if it was built under a building permit, if the locality issued a certificate of occupancy or use permit for it, or if the owner has paid local taxes on it for more than the previous 15 years. In those cases the building is treated as nonconforming instead.
Nonconforming is not the same as compliant. A nonconforming building can usually stay, but rebuilding after a casualty, expanding it or changing its use can trigger the current code. Those are exactly the questions a lender and buyer need answered before closing.
How to check before you close in Northern Virginia
- Fairfax County: a Zoning Compliance Letter states the lot’s zoning, any proffered or development conditions, whether existing development complies with the Zoning Ordinance, and whether there are pending zoning applications or violations. Requests go through the PLUS portal; the base fee is $165 per single-family lot and $450 per lot for all other uses, and processing can take up to 30 calendar days.
- Arlington County: a Zoning Compliance Letter is requested online; the county says to expect about 30 to 45 days and offers no expedited service.
- City of Alexandria: there is no published letter form; zoning questions go to the Zoning Planner of the Day.
- Check separately for open building permits, code enforcement cases and the certificate of occupancy. A zoning letter alone usually does not cover them.
See our Virginia zoning guide for letters, fees and turnaround times in more than a dozen Virginia cities.
Where a zoning report fits
A ZoningWorx zoning report pulls these pieces together for one property: the zoning district and permitted uses, setbacks, height and parking, building, zoning and fire code violations, certificates of occupancy, variances and special permits, and a legal conforming or nonconforming conclusion with a right-to-rebuild statement. Reports follow ALTA 3.0 and 3.1 requirements, are certified to your lender, title company and counsel, and can be delivered in as little as 24 to 48 hours.
This article is general information, not legal advice. Talk to your title underwriter and counsel about the coverage on a specific deal.
Sources
- Riker Danzig: Missouri Supreme Court Reinforces Coverage Limits for Zoning Matters in Standard ALTA Policy (Sachtleben v. Alliant National Title, 2024)
- ALTA Endorsement 3.1-06 (Zoning, Completed Structure), Stewart Title
- Code of Virginia § 15.2-2307
- Fairfax County: Zoning Compliance Letter
- Arlington County: Zoning Compliance Letter Request
See what’s included in our zoning reports, from permitted uses to rebuild rights, or how our zoning verification letter service gets you the city letter and every approval document behind it.